USELESSUSDT · historical base rate

Crowd long, leaders not on USELESSUSDT

Global accounts sit at least 65% long while top traders run at least 10 points less long than the crowd.

What has happened on USELESSUSDT when it held

Historically, when Crowd long, leaders not on USELESSUSDT held (23 occurrences in the scanned window, 23 with a computable 24h horizon), the market reached +5% within 24h in 15 of 23 (65.2) and drew down 10%+ in 7 of 23 (30.4). Maximum favorable (MFE) and maximum adverse (MAE) excursions, both computed forward.

Outcome distribution

WHAT FOLLOWED · ALL 23 MATCHES

19 of 23 (82.6%) reached +0% or more within 1 hour · smallest move size with matches, picked for you

Pick a window and a move size: how often did a move at least that big follow?

WINDOWMOVE SIZE

🔒 Measured after every match, never by keeping winners. 23 of the matches have a complete 1 hour forward.

What are MFE and MAE?
When they happened - one bar per UTC day, all 23 matches
603MATCHES PER UTC DAY · MAX 6 ON 2026-08-1716311114508-0308-1008-1708-2408-312026-08-03 TO 2026-09-02 · 31 UTC DAYS · ZERO DAYS KEEP THEIR SLOT

About 0.7 a day, on 9 of 31 days: spread through the record rather than one event.

Where the next 30 minutes landed - 23 measured, 0 too recent
≥ +0: 10 OF 232332121171≤−100−1−0.5−0.2−0.1<00++0.1+0.2+0.5+1≥+400

Forward 30-minute returns across 23 matches: close to an even split, which is what a coin flip looks like.

How to read a distribution
Upside reached · 24hUpside reached (MFE, 24h)The most price moved up within 24h of each occurrence: a high-water mark, never a close. 23 with a complete 24h.
Drawdown · 24hDrawdown (MAE, 24h)The worst price moved against within 24h of each occurrence: the deepest point, never the close. 23 with a complete 24h.

Versus baseline

Historically, when any eligible USELESSUSDT minute in the window (baseline) held (35,066 occurrences in the scanned window, 33,565 with a computable 24h horizon), the market reached +5% within 24h in 15,291 of 33,565 (45.6) and drew down 10%+ in 3,199 of 33,565 (9.5). Maximum favorable (MFE) and maximum adverse (MAE) excursions, both computed forward.

The full record

The same setup counted over every recorded day on USELESSUSDT (2026-08-03 to 2026-09-02), growing daily.

Historically, when Crowd long, leaders not on USELESSUSDT over the full record held (23 occurrences in the scanned window, 23 with a computable 24h horizon), the market reached +5% within 24h in 15 of 23 (65.2) and drew down 10%+ in 7 of 23 (30.4). Maximum favorable (MFE) and maximum adverse (MAE) excursions, both computed forward.

WHAT FOLLOWED · ALL 23 MATCHES

19 of 23 (82.6%) reached +0% or more within 1 hour · smallest move size with matches, picked for you

Pick a window and a move size: how often did a move at least that big follow?

WINDOWMOVE SIZE

🔒 Measured after every match, never by keeping winners. 23 of the matches have a complete 1 hour forward.

What are MFE and MAE?
When they happened - one bar per UTC day, all 23 matches
603MATCHES PER UTC DAY · MAX 6 ON 2026-08-1716311114508-0308-1008-1708-2408-312026-08-03 TO 2026-09-02 · 31 UTC DAYS · ZERO DAYS KEEP THEIR SLOT

About 0.7 a day, on 9 of 31 days: spread through the record rather than one event.

Where the next 30 minutes landed - 23 measured, 0 too recent
≥ +0: 10 OF 232332121171≤−100−1−0.5−0.2−0.1<00++0.1+0.2+0.5+1≥+400

Forward 30-minute returns across 23 matches: close to an even split, which is what a coin flip looks like.

How to read a distribution
Check our work: the key that re-runs this exact count (q#176c2974)
grammar
research_query.v2
normalization
archive_normalization.v1
feature library
feature_defs.v1
dataset revision
a281b19feb65387cbcc986dba2832ad561add153e773e9c458b2553723b1e470
query hash
176c2974b0a16998aa1dd9fa4262f6d3fb22a8c47113f857fb1a77f3082a730d
scanned window
2026-08-03T00:00:00.000Z to 2026-09-02T00:00:00.000Z (UTC)

Same key, same bytes. This receipt reruns; it does not retell. When the record grows, the dataset revision changes and says so.

Re-run this yourself, over the API or from an AI agent

This is the exact search definition behind the receipt. Send it to the key-authed research API (or the MCP research tool) and compare the bytes: a cached rerun is free.

{
  "schema_version": "research_query.v2",
  "normalization_version": "archive_normalization.v1",
  "feature_version": "feature_defs.v1",
  "target": "record_occurrences",
  "where": {
    "all": [
      [
        "feature.top_global_long_skew",
        "lte",
        -0.1
      ],
      [
        "feature.global_long_ratio",
        "gte",
        0.65
      ],
      [
        "identity.symbol",
        "eq",
        "uselessusdt"
      ],
      [
        "times.anchor_time",
        "between",
        [
          "2026-08-03T00:00:00.000Z",
          "2026-09-02T00:00:00.000Z"
        ]
      ]
    ]
  },
  "sort": [
    "times.anchor_time",
    "desc"
  ],
  "page": {
    "limit": 50,
    "cursor": null
  }
}
curl -s https://app.edgedepth.com/api/v1/research/query \
  -H 'authorization: Bearer $EDGEDEPTH_API_KEY' \
  -H 'content-type: application/json' \
  -d '{"schema_version":"research_query.v2","normalization_version":"archive_normalization.v1","feature_version":"feature_defs.v1","target":"record_occurrences","where":{"all":[["feature.top_global_long_skew","lte",-0.1],["feature.global_long_ratio","gte",0.65],["identity.symbol","eq","uselessusdt"],["times.anchor_time","between",["2026-08-03T00:00:00.000Z","2026-09-02T00:00:00.000Z"]]]},"sort":["times.anchor_time","desc"],"page":{"limit":50,"cursor":null}}'

How to read this

  • Counts ship with denominators: occurrences across the eligible symbol-buckets scanned. A rate is over the occurrences with a computable horizon (present), never the total.
  • Absent is absent. When a feature was not warm at a minute, that bucket leaves the denominator and is reported; it is never coerced to zero.
  • This selects a setup, never its outcome. The grammar forbids filtering on what followed (OUTCOME_IN_PREDICATE), so the distribution below is over every occurrence, not a survivorship-picked subset.

Occurrences are observed examples in a selected archive, not a guarantee. Outcomes are computed forward from each anchor and are descriptive, never a filter and never a prediction. Nothing here is trading advice.

Everything measured on USELESSUSDT right now: the USELESSUSDT research page