Price touched +5% or higher
- When this held
- 14 of 20, too few for a rate
- Other minutes
- 51.4% · 14,444 of 28,113 minutes
Global accounts sit at least 65% long while top traders run at least 10 points less long than the crowd.
A tested result leads to Plan a trade, which measures what trading it would have paid after costs.
Other minutes are the same markets and dates without this condition. Each percentage is the share of measured minutes that reached that move from the starting price.
Price can touch both levels within the same 24 hours.
This counts how often price touched a level, not what trading it would have paid.
All 20 matches have a full 24 hours after them.
Every condition is measured over the same 24 hours, whatever the length of its own reading. Other windows and move sizes shows shorter and longer windows.
About 0.6 a day, on 11 of 31 days: spread through the record rather than one event.
Every recorded day on APRUSDT, 2026-05-15 to 2026-08-14: reached +5% in Unavailable; fell to −10% in Unavailable, within 24 hours.
| Move | 1 hour | 4 hours | 24 hours | 72 hours | 7 days |
|---|---|---|---|---|---|
| Measured | 20 | 20 | 20 | 20 | 17 |
| Too recent | 0 | 0 | 0 | 0 | 3 |
| +0.1% or more | 19 | 20 | 20 | 20 | 17 |
| +0.2% or more | 18 | 19 | 19 | 19 | 16 |
| +0.5% or more | 16 | 19 | 19 | 19 | 16 |
| +1% or more | 13 | 19 | 19 | 19 | 16 |
| +2% or more | 7 | 15 | 16 | 18 | 15 |
| +5% or more | 4 | 7 | 14 | 16 | 13 |
| +10% or more | 2 | 6 | 13 | 15 | 12 |
| +15% or more | 0 | 3 | 9 | 11 | 11 |
| +20% or more | 0 | 2 | 8 | 10 | 11 |
| +30% or more | 0 | 1 | 6 | 10 | 11 |
| +50% or more | 0 | 1 | 4 | 6 | 10 |
| +100% or more | 0 | 0 | 1 | 1 | 6 |
| −0.1% or lower | 20 | 20 | 20 | 20 | 17 |
| −0.2% or lower | 20 | 20 | 20 | 20 | 17 |
| −0.5% or lower | 18 | 20 | 20 | 20 | 17 |
| −1% or lower | 15 | 17 | 19 | 20 | 17 |
| −2% or lower | 13 | 15 | 18 | 20 | 17 |
| −5% or lower | 7 | 9 | 16 | 19 | 17 |
| −10% or lower | 4 | 4 | 8 | 12 | 15 |
| −15% or lower | 1 | 3 | 5 | 10 | 11 |
| −20% or lower | 0 | 1 | 3 | 9 | 10 |
| −30% or lower | 0 | 1 | 2 | 4 | 8 |
| −50% or lower | 0 | 0 | 0 | 0 | 3 |
Each window counts only matches old enough for it, so a longer window can show fewer.
| Move | 1 hour | 4 hours | 24 hours |
|---|---|---|---|
| Measured | 0 | 0 | 0 |
| Too recent | 0 | 0 | 0 |
| +2% or more | 0 | 0 | 0 |
| +5% or more | 0 | 0 | 0 |
| +10% or more | 0 | 0 | 0 |
| −5% or lower | 0 | 0 | 0 |
| −10% or lower | 0 | 0 | 0 |
Each window counts only matches old enough for it, so a longer window can show fewer.
Matches per UTC day
Reproducibility key (q#939310a5)
The key that re-runs this exact count. Same key, same bytes; when the record grows, the dataset revision changes.
Re-run over the API
The exact search definition behind this count. Send it to the key-authed research API (or the MCP research tool) and compare the bytes; a cached rerun is free.
{
"schema_version": "research_query.v2",
"normalization_version": "archive_normalization.v1",
"feature_version": "feature_defs.v1",
"target": "record_occurrences",
"where": {
"all": [
[
"feature.top_global_long_skew",
"lte",
-0.1
],
[
"feature.global_long_ratio",
"gte",
0.65
],
[
"identity.symbol",
"eq",
"aprusdt"
],
[
"times.anchor_time",
"between",
[
"2026-10-04T00:00:00.000Z",
"2026-11-03T00:00:00.000Z"
]
]
]
},
"sort": [
"times.anchor_time",
"desc"
],
"page": {
"limit": 50,
"cursor": null
}
}curl -s https://app.edgedepth.com/api/v1/research/query \
-H 'authorization: Bearer $EDGEDEPTH_API_KEY' \
-H 'content-type: application/json' \
-d '{"schema_version":"research_query.v2","normalization_version":"archive_normalization.v1","feature_version":"feature_defs.v1","target":"record_occurrences","where":{"all":[["feature.top_global_long_skew","lte",-0.1],["feature.global_long_ratio","gte",0.65],["identity.symbol","eq","aprusdt"],["times.anchor_time","between",["2026-10-04T00:00:00.000Z","2026-11-03T00:00:00.000Z"]]]},"sort":["times.anchor_time","desc"],"page":{"limit":50,"cursor":null}}'